Turf takes about two weeks to root in. Through that first week, the soil under the rolls has to stay continuously moist — that's non-negotiable. After the first week, follow the maintenance schedule we hand you on delivery.
Plan delivery so the rolls go down fast. In spring and summer, unroll and lay them as soon as they arrive. In autumn and winter, unroll and lay within 12 hours. The order needs planning around your site readiness — by the time the rolls are at the gate, the soil should be prepped, the irrigation should be on, and the install team should be ready to start.
